Solar Power Project

Project Name:Delta Products Corporation
Location:Fremont, CA
Highlights:
763.84 kW DC system,
(2467) 250Watt NeoSolar modules
(29) Delta 3Phase inverters
Sollega ballasted racking
Description:

This brand new manufacturing facility and showroom utilizes advanced geothermal, rain collecting and solar Photovoltaic technology to stand out as one of the most advanced NET ZERO buildings in he Bay Area and serves as the American headquarters for the Delta Products Corporation.

In the News

Sollega FastRack 510 supports 616-kW project in Fremont, California

Click here to read the story.
Rodda Electric
Brentwood Office
380 Carrol Court, Suite L
Brentwood, CA 94513
Office: (925) 240-6024

Fremont Office
47615 Lakeview Blvd, A4L
Fremont, CA 94538
Office: (510) 252-1300
Fax: (510) 252-1280

License No. 754354
Commercial Electric Services
Medium Voltage Terminating & Splicing
Control Wiring
Co-Gen Plant Electrical Systems
Instrument Control Wiring
Underground Electrical Installation